Project: Guangxi Mine-high efficiency thickener EPC project-polymetallic deposit, improve the thickness of materials and collect recycle water for tin ore

Project details:

1. Background: Gaofeng Mine is a combined mine with mining and processing. The mining is done underground and the mining ways are slicing filling and sublevel open stop subsequent filling. The processing is magnetic- refloating- gravity concentration. Now the annual processing capacity around 0.33 million tons and filling capacity 80,000 cube meter/year. The main product is tin concentrate, lead concentrate and zinc concentrate, etc.

2. Equipment list and capacity

Φ18m lead/zinc concentrate thickener daily capacity 90.42t/d 1 unit
Φ18m zinc/sulphur concentrate thickener daily capacity 450.44t/d 1 unit
Φ24m zinc concentrate thickener daily capacity 263.1t/d 1 unit
Φ18m gravity concentrate middling thickener daily capacity 203.58t/d 1 unit
Φ30m magnetic separation tailing thickener daily capacity 953t/d 1 unit
Φ30m fine deposit thickener daily capacity 176t/d 1 unit
Φ30m tailing thickener daily capacity 306t/d 1 unit

3. Project result:Pilot project of metallic mining thickener in domestic

Share This Post :

POPULAR POSTS

case-Gold-flotation-tailing-dry-discharge-technology-upgrade-project-1
Gold flotation tailing dry discharge technology upgrade project
Guangxi-Mine-high-efficiency-thickener-EPC-project-1
Guangxi Mine-high efhciency thickener EPC project-polymetallic deposit
Heibei-Nanshan-Group-Iron-Tailing-EPC-project-1
Heibei Nanshan Group, Iron Tailing EPC project- tailing recycle, Sand making, tailing dry discharge and recycle
Geermu Potash Fertilizer solid-liquid separation project

Have Any Queries?

Leave a message